March 4, 2022
December 14, 2021
December 13, 2021
The land has been graded and the building pad is currently to grade
Sanitary sewer is installed and complete
The existing hydrant has been relocated and also 350LF of watermain have been installed. The water was already at the tap connection point.
November 30, 2021