Nelson Construction & Development led the design-build team, including OPN Architects and Strategic Design, to create this 9,800 square foot retail center as quickly as possible. Special considerations had to be made regarding the exterior of the building due to the visibility on all four sides and the proximity to a residential neighborhood.
The building was designed and constructed in five months and was able to have tenants operating their businesses within six months, total. Extensive site work was done to create enough parking to serve a retail center on a small site with sloping grades, including an underground storm water detention basin.