Pinnacle Prairie December 13, 2021

  • The land has been graded and the building pad is currently to grade
  • Sanitary sewer is installed and complete
  • The existing hydrant has been relocated and also 350LF of watermain have been installed. The water was already at the tap connection point.

Recent News